04-18-11 Town Council Packets(3) r MEMORANDUM TO: Snowmass Village Town Council FROM: Hunt Walker DATE: April 18, 2011 SUBJECT: Road Fund Project List I. PURPOSE AND ACTIONS REQUESTED OF COUNCIL: To update the Council on the Road Fund Project List, and to specifically review with Council the RFTA Depot and Lower Carriageway ramp reconstruction project. No Council action necessary. II. BACKGROUND Last fall as part of the Road Fund Budget Public Hearing, Staff presented a preliminary 2011 project list. After inspecting and rating the Town's roads this March, Staff developed the attached project list. $513,000 has been budgeted for the road surfacing projects. In addition the project list includes stabilizing three existing tie walls located in Upper Lot 7, below Lower Lot 7, and Upper Lot 6. Two new soil nail walls will be constructed, one in Wood Run and the other in Ridge Run. $339,980 has been budgeted for the tie wall project. The asphalt in the RFTA Depot and the Lower Carriageway ramps has deteriorated to the point that it needs to be replaced (see attached pictures). The asphalt in the Depot will be replaced with concrete while the poor asphalt in the traffic lanes will be replaced with new asphalt. To complete the project the Town will remove and replace the median separating the Depot and the traffic lanes and eliminate the divider separating the traffic lanes (see attached map.) As explained in the attached Construction Management Plan the goal is to provide two lanes of traffic most of the time with one lane of traffic during construction during the day. Road Fund 2011 Project List RFTA Depot and Lower Carriageway ramp reconstruction/replacement of vehicle traveled lanes with median, curb and gutter replacement, lane divider removal along with concrete asphalt resurfacing. Brush Creek Road 1 I /z" Asphalt Overlay from Horse Ranch Drive to upper south Snowmass Villas entrance. Owl Creek Road 1 1 /2" Asphalt Overlay from Little Red School House to Fairway III employee housing driveway entrance. Brush Creek/Mountain View Bus stop asphalt paving. Spruce Ridge Lane 1 1 /2" Asphalt Overlay finish up from where left off in 2010. Misc. asphalt patching of Deer Ridge, Divide Road and Owl Creek Road. Upper Brush Creek Road 3/8" Chip seal w /fog (Wood Road to RFTA Depot) Horse Ranch Drive 3/8" Chip seal w /fog (Branding lane to end). Two Creeks Drive 3/8" Chip seal w /fog (Owl Creek Road to Timber Ridge Lane) Blue Spruce Lane 3/8" Chip seal w /fog. Timber Ridge Lane 3/8" Chip seal w /fog. Harlston Green 3/8" Chip seal w /fog. ST. Andrews CT. 3/8" Chip seal w /fog. Work to be done May 19` to June 2. Tie Wall and Soil Stabilization Projects: Upper and Lower Lot 7 Tie Wall Stabilization. Upper Lot 6 Tie Wall Stabilization. Ridge Road Soil Stabilization. Wood Road Soil Stabilization. t F y t K w 3 i z 4 F t e Ni e r s- w ��`i t +r, a��. ,.5 a'/ h3., �1Z Y IC �V 4 i ip''.w G' ly �y �I r iCi Y t ,a; %7 >'a R, N�... 4 �w w. t. 2 L «w \y a 2 2 2 w 2 V j x w Replace w concrete Remove and replace curb and gutter igf 'r tai New asphalt x >y Eliminate Divider Remove and replace Median w M x Y v 4W= v a. r t t Town of Snowmass Village Construction Management Plan PROJECT: RFTA Depot and lower ramp vehicle lane reconstruction DATE: April 11, 2011 OWNER: CONTACT INFO: R. Hunt Walker 923 -5110, ext. 300 John Baker 923 -5110, ext 301 Ed Fuller 923 -5110, ext. 302 CONTRACTOR: CONTACTINFO: Grand River Construction 379 -1464 Zen Construction 274 -0740 ENGINEER: CONTACT INFO: Dean Gordon, Engineer 945 -1004 TRAFFIC CONTROL: A -1 Traffic Control 876 -0738 CONSTRUCTION SCHEDULE: April 19 to June 2, 2011, 6 days per week, 7 a.m. to 7 p.m. PROJECT LOCATION: RFTA Depot vehicle lanes and Carriageway Road ramps. PROJECT DESCRIPTION: The Town of Snowmass Village will be reconstructing the RFTA vehicle lanes and removing and replacing the median between the Depot and inbound traffic lane. The divider separating the inbound and outbound traffic lanes on the ramps will be removed. There is about 600'of curb and gutter replacement along with 5,500 sq. ft. concrete flat work to replace existing asphalt in the bus depot. Also the lower Carriageway ramps will be re- graded and replaced with new asphalt. CONSTRUCTION STAGING: Lower back gravel area of Lot 6 will be used to store materials and equipment. ACCESS/TRAFFIC CONTROL PLAN: Access will be kept open for through two way traffic of Carriageway but with lane shifts and possible one lane traffic during day time construction while placing asphalt or pouring concrete which will have proper signage and flaggers. RFTA depot service will be signed and serviced out of the Daly Lane bus depot. PUBLIC NOTIFICATION: Town staff, through newspaper ads, Town Web site and roadway signs, will inform the public about the project.