Loading...
170403 EMH Presentation 1 - Jt Mtg Enclave's Prel Plan Regulatory Framework.ppt ENCLAVE April 03, 2017 the Z-Group Architects PUD Application, Joint Meeting 01 Vicinity Plan 02 Vicinity Photo (Google Earth) 03 TOWN HALL THE ENCLAVE BRUSH CREEK ROAD WOOD ROAD Existing Conditions - Carports 04 Exterior Conditions - Siding 05 Exterior Conditions - Siding 06 Existing Conditions - Retaining Wall 07 Existing Conditions - Carports 08 Existing Conditions - Carports 09 Site 10 Site 11 Site 12 Site 13 Site 14 Site 15 Site 16 Site 17 Site 18 Site 19 Site 20 Site 21 Site 22 Site 23 New Area Definition, Slide 1 of 5: Total Property Configuration 24 New Area Definition, Slide 2 of 5: Abandoned Ski Easement 25 New Area Definition, Slide 3 of 5: Area Cut-Off by Easement 26 New Area Definition, Slide 4 of 5: Gondola Right-of-Way 27 New Area Definition, Slide 5 of 5: New Area Available 28 Open Space Plan 29 View from East Carport – Previous Finish Colors 30 31 View from East Carport – Finish Colors installed Summer 2015 View of Northeast Corner – Previous Finish Colors 32 View of Northeast Corner, Driving Up Wood Road 33 34 View of Northeast Corner – Phase 1 Roof, Dormers, & upper 1/3 Siding, Completed Fall 2016 35 Phase 1 Roof, Dormers, & upper 1/3 Siding, Completed Fall 2016 Existing Entry 36 New Entry & Proposed Arrival Building 37 Proposed Arrival Building 38 Proposed Arrival Building 39 Proposed Arrival Building 40 Proposed Arrival Building 41 Site Circulation: Bus Stop to Arrivals Building 42 FUTURE BUS STOP Existing Arrival Building 43 Existing Arrival Building, Employee Units Upper Level 44 Existing Arrival Building, Employee Units Lower Level 45 46 North Elevations (Wood Road): Carports & Existing Arrival Building 47 Proposed Tandem Carport, Section Looking West 48 Proposed Free Market Unit at Existing Employee Unit, Basement Level, Northeast Corner Proposed Free Market Unit at Existing Employee Unit, Basement Level, Northeast Corner` 49 Proposed Free Market Unit at Existing Employee Unit, Basement Level, Northeast Corner 50 51 Existing Stair Tower, Proposed Renovation 52 Existing Stair Tower, Proposed Renovation 53 Existing Stair Tower, Proposed Renovation 54 Existing Stair Tower, Proposed Renovation 55 Existing Stair Tower, Proposed Renovation 56 Existing Stair Tower, Proposed Renovation Proposed 5-Unit Building, View from West Parking Area 57 Proposed 5-Unit Building, View of South and West Facades 58 Proposed 5-Unit Building, View from North 59 Proposed 5-Unit Building with Parking Garage Below 60 Proposed 5-Unit Building with Parking Garage Below 61 Proposed 5-Unit Building, Elevations 62 Proposed 5-Unit Building, South Elevation 63 Proposed 5-Unit Building, West Elevation, (viewed from The Crestwood) 64 Proposed New Arrival Building with Green Roof over Carport 65 Overall Birdseye View from South 66 View of Northeast Corner, Driving Up Wood Road 67 68 END 01 Viewed From: The Crestwood, Top Floor Unit (Approx. 24’ above grade), Existing View 02 Viewed From: The Crestwood, Top Floor Unit, (Approx. 24’ above grade), Base Village 03 Viewed From: The Crestwood, Top Floor Unit, (Approx. 24’ above grade), Base Village & Proposed Enclave Units