Loading...
MAIN_Enclave_PP_PUD_PC2 6-21-17.ppt ENCLAVE June 21, 2017 the Z-Group Architects PUD Application, Planning Commission Vicinity Plan Exterior Conditions - Siding Existing Conditions - Retaining Wall View from East Carport – Previous Finish Colors View of Northeast Corner – Previous Finish Colors View of Northeast Corner – Phase 1 Roof, Dormers, & upper 1/3 Siding, Completed Fall 2016 Exterior Conditions, Prior to Roof Project Phase 1 Roof, Dormers, & upper 1/3 Siding, Completed Fall 2016 New Area Definition, Slide 3 of 5: Area Cut-Off by Easement New Area Definition, Slide 5 of 5: New Area Available Site Site Existing Conditions – Site Entry New Entry & Proposed Arrival Building Proposed Arrival Building Proposed Arrival Building Proposed New Arrival Building with Green Roof over Carport Proposed Arrival Building Proposed Arrival Building Existing Arrival Building Existing Arrival Building, Employee Units Upper Level 44 Existing Arrival Building, Employee Units Lower Level 45 Proposed Free Market Unit at Existing Employee Unit, Basement Level, Northeast Corner North Elevations (Wood Road): Carports & Existing Arrival Building Proposed Tandem Carport, Section Looking West Existing Stair Tower, Proposed Renovation Existing Stair Tower, Proposed Renovation Existing Stair Tower, Proposed Renovation Proposed 5-Unit Building, View from West Parking Area Proposed 5-Unit Building, View of South and West Facades Proposed 5-Unit Building with Parking Garage Below Proposed 5-Unit Building with Parking Garage Below Proposed 5-Unit Building, Elevations Density & Height Comparison Density & Height Comparison BASE VILLAGE THE ENCLAVE THE CRESTWOOD Density & Height Comparison BASE VILLAGE BASE VILLAGE Approximate Density: 32 Units/Acre Building Height (Building 10A): 85’-0”, Elevation of roof ridge = 8501’ (does not include Cupola) 10A Density & Height Comparison THE CRESTWOOD CRESTWOOD CONDOMINIUMS Approximate Density: 29 Units/Acre Approximate Building Height: range from 32’-0” to 40’-0”, Elevation of closet roof ridge is approximately 8520’ Density & Height Comparison THE ENCLAVE THE ENCLAVE CONDOMINIUMS Proposed Density = 11.09 Units/Acre Building Heights: range from 32’-0” to 36-6”’, Elevation of closest existing roof ridge = 8502.5’ Proposed Height at highest point = 36’-4”, Elevation of highest proposed roof ridge = 8496.06’ xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx Section View Looking North Grade Section #4: East Elevation looking West Grade Section #2: West Elevation looking East Conceptual Landscape Plan Planting Views Planting Views Base Village Pedestrian Access Diagram Possible Sidewalk with Enclave PUD (Yellow Path) Continuation of Possible Sidewalk with Future Base Village Construction (Yellow Path) Pedestrian Path Options: Length Comparisons YELLOW PATH = 685 LF BLUE PATH = 650 LF RED PATH = 525 LF Shadow Study: March 21, 9:00 a.m. Shadow Study: March 21, 12:00 p.m. Shadow Study: March 21, 3:00 p.m. Shadow Study: February 5, 9:00 a.m. Shadow Study: February 5, 12:00 p.m. Shadow Study: February 5, 3:00 p.m. Shadow Study: December 21, 9:00 a.m. Shadow Study: December 21, 12:00 p.m. Shadow Study: December 21, 3:00 p.m.