Loading...
06-17-19 Supplement EOTC EOTC Preparation Meeting June 17, 2019 1.Overview-Prep20 EOTC Meeting June OnlyInformation -Updates 4.)DYNAMIC MESSAGE SIGN (DMS-FLAP GRANT IMPROVEMENTS-BRUSH CREEK PARK AND RIDE -ItemsEOTC Action 3.EOTC Funding-Update 2.EOTC Decisions Reached-March 21, 2019 March 21, 2019 Standardize name to “Brush Creek Park and Ride”.4.to each EOTC jurisdiction, decide between a 26’ and 18’ wide Butterfly sign. Visualizations and messages presented EOTC requested further information on the sign’s visual and message impacts in order to 3.Utilize Butterfly design, 2.Reallocate $400,000 from 2020 EOTC budget to 2019, 1.Decisions: ○ Dynamic Message Sign (DMS)● Decision: Continue to October 17, 2019 EOTC meeting. Explore other transit use options.○ Account to Unallocated.service between Snowmass and Brush Creek Park and Ride from Snowmass Savings Reallocation of funds BRT connecting -Impacts from RFTA Ballot Measure 7A ● Decisions Reached- March 21, 2019 Transportation Administrator-David Pesnichak -X Games Revenue vs. Cost ○ Transportation Administrator-David Pesnichak -Aspen Country Inn Subsidized Rides ○ Transportation Administrator-David Pesnichak -HOV Lane Enforcement ○ Village, Transportation DirectorTown of Snowmass -David Peckler -Town of Snowmass Village Transit Station Update ○ ● Decision: Staff to send out a Doodle Poll to determine an optimal date for the retreat.○ Set Date for EOTC Retreat● Station” Restroom Location-Decision: “Mid○ FLAP Grant-Brush Creek Park and Ride ● Decisions Reached (con’t)- EOTC Funding Update Sales Tax Expected to Increase● Use Tax Expected to Decline● Motor Vehicle Use Tax to Remain Unchanged● Construction Materials will Pay Sales Tax if Delivered, not Use Tax (Only Pay One)● Internet Deliveries Now Taxed Local Rates○ Most Construction Materials are Delivered○ Sales Taxed at Point of Delivery● RFTA(0.5%)Sales Tax Wide -County(0.5%)Use Tax Wide -County81.04%-RFTA IncreaseRevenue Expected DecreaseRevenue Expected at Brush Creek, Airport, and/or Buttermilk (IGA)Ride Lots-n-ParkOperation of -Airport and between Aspen and Snowmass (IGA)between Aspen and the Way-Seperate, Dedicated TransitConstruction and Operation of a -(IGA)Comprehensive Valley Transportation Plan Implement the -(Ballot)Public Mass Trans. System within the Roaring Fork ValleyIncrease and Improve the -Finance, Construct, Operate, Manage Mass Transportation System (CRS)-:Net Revenue Decrease To Fund18.96% -EOTC 100%-EOTC Impacts from State Legislation Brush Creek Park and Ride Use of Cameras and/or Call BoxesConsider Security: -Designing Building to LEED PrinciplesConsider Sustainability: -Solar PanelsInstallation of Rooftop and/or Ground MountedConsider Solar Panels: -Installation of Snow Melt SystemConsidering Snow Melt: -Open, Covered, Partially EnclosedSpecial Events / Info Booth Area: -70,000 of FLAP Matching Funds from 2020 to 2019$Funding Reallocation: -EOTC Action Needed: ● Moving to 30% PlansPublic Opinion Survey (80 Responses)Open House Conducted at CMCUpdate: -Station” restroom location, March 21, 2019. -EOTC Decided on “Mid● ImprovementsFLAP - Brush Creek PnR○ June 20, 2019 EOTC Decision Needed:● Use “Brush Creek Park and Ride”○ 18’ Wide Sign○ Butterfly Design○ Reallocate Construction Funding to 2019○ March 21, 2019 EOTC Decisions:● Engineering and Outreach● Dynamic Message Sign (DMS) EOTC Updates RFTA RETREAT AND 7A UPDATE (David Johnson)● SNOWMASS VILLAGE TRANSIT CENTER UPDATE (David Peckler)● Hudson Room)-(Retreat Set for August 7 from 8.15 am to 3 pm at Aspen Institute (David Pesnichak, Stephanie Zaza)RETREAT UPDATE ● Information Only- Questions Brush Creek PnR 2.2 Miles1 Mile WaySmith WayWildcat Creek PnRBrush LocationAlternate LocationRecommended Staff Dynamic Message Sign (DMS) Brush Creek PnR(2.2 Miles from Brush Creek)Alternate Location (1 Mile from Brush Creek)Staff Recommended Location Dynamic Message Sign (DMS) EOTC Funding Update IGA, 1993Adopted by -Plan Valley Transportation Comprehensive